Kamala Hydroelectric Project: Hydropower Potential and Forest Conservation
Why in News?
The National Hydroelectric Power Corporation (NHPC) has sought approval from the Union Environment Ministry to divert 3,278 hectares of forest land in Arunachal Pradesh for its proposed 1,720-megawatt (MW) Kamala hydroelectric project on the Kamala River, a right-bank tributary of the Subansiri River. The proposal raises concerns about forest loss, wildlife habitats and the social impact of hydropower development in the ecologically sensitive Eastern Himalayas.
What Are the Key Features of the Kamala Hydroelectric Project?
• Location and capacity: The project is planned across Kra Daadi, Kurung Kumey and Kamle districts of Arunachal Pradesh, with a proposed capacity of 1,720 MW.
• Project design: Conceived as a run-of-the-river cum storage project, it involves a 216-metre-high concrete gravity dam with flood-moderation features. The project is estimated to cost ₹2,400 crore.
• Forest diversion: The proposal involves diverting 3,278 hectares of forest land, including 439 hectares of very dense forest and 1,119 hectares of moderately dense forest.
• Tree felling: A total of 23,40,213 trees are earmarked for felling. Of these, 15.08 lakh are in the Hapoli forest division and 8.31 lakh in the Kra Daadi division.
• Environmental clearance: The project received a recommendation for environmental clearance in January, subject to obtaining in-principle forest clearance. The Forest Advisory Committee (FAC) was scheduled to appraise the forest-diversion proposal on 23 October 2026. The outcome of this appraisal is not specified in the supplied material.
What Are the Major Environmental and Social Concerns?
• Loss of forest cover: The proposed diversion would affect a largely hilly river valley covered predominantly by dense forests. Field surveys recorded 155 plant species belonging to 69 families.
• Wildlife habitat and movement: Although the site inspection report found that the project site does not fall within a national park, wildlife sanctuary, biosphere reserve or elephant corridor, it noted that the project would affect wildlife habitats. The wider submerged area could also obstruct the movement of wild animals between riverbanks.
• Compensatory afforestation: The proposal provides for afforestation over 7,018 hectares across several districts of Madhya Pradesh. Under the Forest Conservation Act framework, compensatory afforestation may be undertaken outside the project state when suitable non-forest land is unavailable locally because of high existing forest cover. Where equivalent non-forest land is unavailable, plantations twice the diverted area must be raised on degraded land.
• Impact on communities: The Social Impact Assessment estimates that 5,440 families across 126 villages will be affected by the project.
• Need for mitigation: The Environment Ministry's regional office in Shillong called for a wildlife mitigation plan or biodiversity conservation plan to address the project's ecological effects.
Why Is the Subansiri River Important?
• A major Brahmaputra tributary: The Subansiri originates in the Tibetan Plateau, flows through Arunachal Pradesh and joins the Brahmaputra system. It is the largest tributary of the Brahmaputra.
• Hydropower potential: The river basin has substantial elevation differences, ranging from a maximum elevation of 5,340 metres near the origin to 99 metres at Gerukamukh near the Assam plains. This steep terrain creates significant potential for hydropower generation.
• Flood vulnerability: Districts along the Subansiri are prone to flooding during the monsoon. The river's hydrological characteristics make flood management an important consideration when planning dams and reservoirs.
• Adventure tourism: The Subansiri is known for its fast rapids and white-water rafting potential. Its riverine landscape also supports recreational activities such as angling.
• Ecological significance: The river valley's forests and wildlife habitats form an important part of the Eastern Himalayan landscape. The Kamala project's potential effects on forest cover, biodiversity and animal movement therefore have implications beyond the immediate dam site.
How Can Hydropower Development Be Balanced with Conservation?
• Strengthen ecological assessment: Environmental appraisal should account for forest density, plant diversity, wildlife movement and the wider impacts of submergence.
• Ensure effective mitigation: Wildlife and biodiversity conservation plans should address habitat disruption and movement across the river valley.
• Implement compensatory afforestation: The proposed plantations in Madhya Pradesh should fulfil the applicable requirements for compensatory afforestation, with attention to the availability of suitable land and the prescribed plantation area.
• Assess social impacts: The concerns of families in the 126 affected villages should be considered in project planning and rehabilitation measures.
• Integrate basin-level planning: The Kamala project is part of a cascade of hydropower projects planned in the Subansiri basin. Assessing projects in relation to the wider river system can help identify cumulative pressures on forests, wildlife, river flows and flood management.